EQUIPMENT DETAILS COOLING TOWERS Annual PREVENTIVE MAINTENANCE

Discussion in 'HVAC' started by Mannan, Mar 10, 2017.

  1. Mannan

    Mannan Administrator Staff Member



    [​IMG]

    [​IMG]


    الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



    EQUIPMENT DETAILS COOLING TOWERS Annual PREVENTIVE MAINTENANCE


    SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


    SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


    [​IMG]

    EQUIPMENT DETAILS COOLING TOWERS Annual PREVENTIVE MAINTENANCE

    صيانة دورية جداول جاهزة نظام بوابات الدخول المؤمنة

    جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

    EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

    MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

    Capacity
    Qty: Lot
    Make & Model

    Location

    COOLING TOWERS Annual PREVENTIVE MAINTENANCE During shut down season


    Task Description
    D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
    A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
    2W M 3M
    6M A Notes

    Item Description
    Qty Notes

    Critical Tasks to be performed

    Drain cooling tower sump and clean basin
    Change gearbox oil
    Clean cooling towers and sump, inspect and repair as necessary: woodwork, plastic work, valves, spray nozzles, fans, pipe work and repair any cracks in the basin
    Paint woodwork if applicable, with suitable preservative
    Check and adjust fan blade pitch angle of the cooling tower, if applicable
    Check bearing and change if necessary
    Remove and clean eliminators and fills
    Overhaul all valves and lubricate spindles
    Check bearing bolts, fan anti-vibration mountings, tighten or replace if necessary
    Inspect, repair or replace as necessary all electrical works

    Other recommended tasks


    Inspect all cooling tower inlet louvers and replace if necessary
    Clean fan guard and cover; check cover for tightness and paint
    Paint the cooling tower
    Inspect fill tile for foreign debris
    Check motors and starters
    Check alignment of fan shaft coupling
    Insulation test for all electrical motors
    Change screen in basin if necessary


    Notes
    Use additional sheets if required
    PPM routines based on Complete
    Running hour where recommended by the Manufacturer