EQUIPMENT DETAILS Main Fire Pumps

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS Main Fire Pumps


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D44&hash=0cacf9fe31f41532184e2e3cb5a04932


EQUIPMENT DETAILS Main Fire Pumps

صيانة دورية جداول جاهزة مضخات الحريق الرئيسة مضخة

Capacity
Qty: Lot
Make & Model

Location

Main Fire Pumps

Consumable Spare Parts

Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Check for any leakage and repair
Check the pump head at nominal flow and
at 150 % or nominal flow to ensure
conformity with design requirement.
Check for the relief valve calibration by
gradually closing the test line
Check pressure switch setting for automatic
cut – in and cut-of jockey pump
Grease and oil the bearing
Check power is healthy on panel and clean
Check bearing and mechanical seal
Clean and paint.
Make general cleaning , check impeller,
clean housing
Check seals and change if necessary
Check the motor full load current by
manipulating the flow
Inspect unit for unusual noise and/or vibration, ensure that it is in good working order.
Provide lubrication, if necessary.
If unit is not running or an identified problem requires the unit to be serviced,

perform ALL Non-Critical Tasks listed below

Flush and clean strainers.
Check operation of gauges and record pressures and temperatures.
Inspect seals and packing, tighten or replace as necessary.
Lubricate impeller shaft bearings.
Inspect motor and pump alignment.
Other recommended tasks
Inspect mounting bolts and vibration isolators of the pump under load conditions.
Start and stop pump, noting any vibration and overall performance.
Inspect drive shaft coupling.


Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=45


في أمان الله !



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Last edited:

Top