What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

Cautery Machines and Electrosurgical Units preventive maintenance

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



Cautery Machines and Electrosurgical Units preventive maintenance


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=166


EQUIPMENT DETAILS Cautery Machines and Electrosurgical Medical
Equipment preventive maintenance

صيانة دورية جداول جاهزة وحدات الجراحة الكهربائية
آلات الكي الجراحية

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

Cautery Machines and Electrosurgical Units preventive maintenance

This includes but not limited to :
cryoprobes, - instance audiometers - blood gas analyzers,
cardiac monitors - stimulators - infusion pumps

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

Cautery Machines and Electrosurgical Units

Daily Routine work:

1-Remove any dust and dirt replace equipment cover
2-Remove any tape, paper or foreign body from equipment
3-Check all fittings and cables are properly connected
4-Check there are no signs of spilled liquids or cable damage
5-Check foot & probe switch smooth operation

Weekly Routine work:

1-Check return plate cable disconnection alarm before use
2-Unplug, clean outside with damp cloth and dry off

Monthly Routine work:

1-Inspect filters, clean or replace if needed
2-Check If any plug, cable or socket is damaged, replace

Other recommended tasks

Quarterly

1- Check proper operation of all controls
2- Check indicators and visual displays

Semi annual

1-check operation on wet soap
2- Check power switch & main socket

Annually Routine Work:

1- Check footswitch and front panel buttons
2- Check patient cable & plate
3- Check connections and plugs on all cables are tight
4- Check all probeS,monitors, and power connections

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=165

or you can download from attachments
No registration required

! في أمان الله



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top