الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS All size of valves, expansion Joints and Insulation
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS All size of valves, expansion Joints and Insulation
صيانة دورية جداول جاهزة نظام العزل المحابس و الصمامات
Capacity
Qty: Lot
Make & Model
Location
All size of valves, expansion Joints and Insulation
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks, to be performed
Check and Clean
Check for any leak if necessary replace angle valves, flexible connection
float mechanisms, washing spray hose
Other recommended tasks
Clean traps
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=74
في أمان الله !
Attachments
-
89.5 KB Views: 717