What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS BIOMEDICAL Fume Cupboard

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


EQUIPMENT DETAILS BIOMEDICAL Fume Cupboard

SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan

SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D121&hash=cd2cd46f8025b474c2c023de778349c8


EQUIPMENT DETAILS BIOMEDICAL Fume Cupboard

صيانة دورية جداول جاهزة نظام مصاعد

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS

Capacity
Qty: Lot
Make & Model

Location
BIOMEDICAL Fume Cupboard maintenance


Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed
Check condition and operation of air cleaning devices, if installed
Check all emergency isolators
Check face velocity
Check condition and operation of fans
Check condition and operation of motors
Check condition and operation of drives , belts
Check bearings and lubricate where necessary

Other recommended tasks

Check condition and operation of wash down facility, if fitted
Check the fire damper, release mechanism, and replace fusible link, if required
Check operation of fluorescent lamp
Check condition and operation of fume cupboard system
remove baffles and clean both the baffles and the rear of chamber
clean interior surface of chamber wash with dilute detergent solution
extract ducting, joints & drain points make up air balance
Check stability and condition of the discharge stack
Check the automatic isolator by providing inadequate airflow conditions

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=122


! في أمان الله


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top