الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Ceramic Sanitary Fixtures
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Ceramic Sanitary Fixtures
صيانة دورية جداول جاهزة نظام الحمامات و مكوناتها
Capacity
Qty: Lot
Make & Model
Location
Ceramic Sanitary Fixtures including fittings.
(W.C., W.B., Shower Tray, Urinal etc )
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks, to be performed
Check and Clean
Check for any leak if necessary replace angle valves,
flexible connection, float mechanisms, washing spray hose
Clean traps
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=65
في أمان الله !
Attachments
-
120.5 KB Views: 2,204