EQUIPMENT DETAILS Chemical Chilled water treatment system
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Chemical Chilled water treatment system
Capacity
صيانة دورية جداول جاهزة وحدة معالجة الماء البارد الكيميائية
Qty: Lot
Make & Model
Location
Chemical Chilled water treatment system
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Check the operation
Check the chemical
Fill chemical if required
Check pump operation
Check controls, terminals, electrodes and printer
/chart recorder
Check for any leak in piping connection, flow
switch status and all valves
Check all accessories W.M., level switch
timer relays, if necessary replace
Perform complete water analysis
Clean and paint the whole system
Notes :
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer