الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Chilled water air handling unit
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
Air- cooled Packaged Water Chiller
Capacity
صيانة دورية جداول جاهزة وحدة مناولة الهواء
Qty: Lot
Make & Model
Location
Annual Requirements to Short Life
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Prepare daily log sheet.
Clean operation and abnormal noise sound
Check the filter and clean
Check for any leaks and repair
Check the operation of control valves
Check belt tension and status
Check damper operation
Check thermometer well
Clean strainer
Check drain line
Clean Coil
Check operation of Control valve
Grease bearing
Check alignment
Clean drain pan
Scrap and clean blower blades
Calibrate control valves and controls
Change belts, filters
Check rusty parts, paint if necessary
Notes :
1 Use additional sheets if required
2 PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=13
في أمان الله !
Attachments
-
228 KB Views: 804