الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Chilled Water Fan Coil Units
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Chilled Water Fan Coil Units
Capacity
صيانة دورية جداول جاهزة وحدة تبريد بملف الماء البارد
Qty: Lot
Make & Model
Location
Chilled Water Fan Coil Units
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Check air filter and clean
Check blower and Motor bearing and change if
necessary
Make necessary oiling and greasing
Clean coil and drain pan
Check the control
Check the blower
Notes :
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=26
في أمان الله !
Attachments
-
132 KB Views: 686