SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS CHILLER Monthly PREVENTIVE MAINTENANCE

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



CHILLER Monthly PREVENTIVE MAINTENANCE


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=185


EQUIPMENT DETAILS CHILLER Monthly PREVENTIVE MAINTENANCE

صيانة دورية جداول جاهزة مبردات ماء مركزية

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

CHILLER Monthly PREVENTIVE MAINTENANCE

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

1- Visual inspection for oil traces (sign of a refrigerant leakage). leaks or unusual noises
2- Air heat exchanger (condenser) cleaning
3- Check the unit alarm
4- Tighten the power circuit electrical connections
5- Check the electrical motorized valves & Check all the functional programs through BMS

Other recommended tasks

6- Check& re-tighten all control/command connections, if required
7- Check the presence and the condition of the electrical protection devices
8- Clean the condensers & Check the fans
9- Check the unit operating parameters and compare them with previous value
10- Cooler heaters are operating, secure and correctly positioned
11- Water side connections are clean and show no sign of leakage
12- Check the temperature and pressure gauges are showing correct value
13- Check the correct operation of heaters
14- Check the heaters are well attached to the oil separator ring

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=186

or you can download from attachments
No registration required

! في أمان الله