الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Cold stores
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Cold stores
صيانة دورية جداول جاهزة مخازن التبريد غرف التبريد
Capacity
Qty: Lot
Make & Model
Location
Cold stores
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Check the operation
(defrosting , liquid level, filter dryer)
Clean the dust
Check vibration noise in compressor and evaporator
Check the evaporator drain and heaters
Check operation panels and connection
Check the temperature
Check any leakage in the system
Check low and high pressure
Check oil in the compressor
Check all solenoid valves
Check from clean water in the condensing unit and clean
the tubes
Check thermostat and its cut in and cut out
Oil in the fan motors
Check head valve of compressor and crank case
Change oil
Check completely the alignment , fan blades one
evaporators and compressors
Check and lubricate the air curtain
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=35
في أمان الله !
Attachments
-
164.5 KB Views: 834
Last edited: