What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Condenser Water Pumps

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS Condenser Water Pumps


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D17&hash=f8a3a01c04a3ee479e9316ce0d07fcab


EQUIPMENT DETAILS Condenser Water Pumps

Capacity
صيانة دورية جداول جاهزة مضخات ماء المكثف الحار
Qty: Lot
Make & Model

Location

Annual Requirements to Short Life

Consumable Spare Parts

Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes



Clean inside pump casing and epoxy coat
Inspect unit for unusual noise and/or vibration, ensure that it is in good working order
Provide lubrication, if necessary.
If unit is not running or an identified problem requires the unit to be serviced
perform ALL Non-Critical Tasks listed below
Check the operation and abnormal noise/sound Level
Check gland and mechanical seals for leakage
Check and clean strainer
Check and grease the pump bearing
Check the coupling wear
Check the alignment
Paint if necessary
Change pump packing
Check mechanical seal for leaks, change if necessary
Flush and clean strainers.
Check operation of gauges and record pressures and temperatures
Inspect seals and packing, tighten or replace as necessary
Lubricate impeller shaft bearings
Inspect motor and pump alignment
Other recommended tasks
Inspect mounting bolts and vibration isolators of the pump under load conditions
Start and stop pump, noting any vibration and overall performance
Inspect drive shaft coupling.

Notes :
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d



http://www.sitei.net/up/do.php?id=16


في أمان الله !



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Last edited:

Top