EQUIPMENT DETAILS ELECTRONICS Access Control System
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS ELECTRONICS Access Control System
صيانة دورية جداول جاهزة نظام بوابات الدخول المؤمنة
جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات
EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED
MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES
Capacity
Qty: Lot
Make & Model
Location
ELECTRONICS Access Control System maintenance
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks to be performed
Check installation against records, record and report any discrepancy
Check inbuilt diagnostics and history file for any error and fault messages
Check and test the operation of all peripheral devices
ensure alarms are registered at the operator station
Check operation of all control equipment
Check and test the operation of every audible, visual alarm and warning device
Check the operation of all activating outputs which respond to an alarm condition
Check the operation of any communication equipment
Check system voltage under full load conditions
Ensure that the output of all standby batteries is not less than 95 percent of rated voltage
Check and record charger output voltage to battery
Check battery terminals for tightness, cleanliness and corrosion
Check battery enclosure for cleanliness and corrosion
For microprocessor based systems check on board battery
For microprocessor based systems check clock setting
Other recommended tasks
Check the condition of all equipment for damaged, stressed or heated components
Check all visible wiring, conduits, connectors and manual interfaces for damage
Check all equipment for proper ventilation
Ensure all switches are set to normal position, mains power is on and connected to system
For microprocessor based systems save set-up and operational parameters on back-up disk
Amend access program to reflect changes due to public holidays
include any operational changes requested by the site
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer