SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS ELECTRONICS Access Control System

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


EQUIPMENT DETAILS ELECTRONICS Access Control System

SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan

SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D130&hash=4ffddb91aaec8354973ef92ebff76db7


EQUIPMENT DETAILS ELECTRONICS Access Control System

صيانة دورية جداول جاهزة نظام بوابات الدخول المؤمنة

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location
ELECTRONICS Access Control System maintenance


Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

Check installation against records, record and report any discrepancy
Check inbuilt diagnostics and history file for any error and fault messages
Check and test the operation of all peripheral devices
ensure alarms are registered at the operator station
Check operation of all control equipment
Check and test the operation of every audible, visual alarm and warning device
Check the operation of all activating outputs which respond to an alarm condition
Check the operation of any communication equipment
Check system voltage under full load conditions
Ensure that the output of all standby batteries is not less than 95 percent of rated voltage
Check and record charger output voltage to battery
Check battery terminals for tightness, cleanliness and corrosion
Check battery enclosure for cleanliness and corrosion
For microprocessor based systems check on board battery
For microprocessor based systems check clock setting


Other recommended tasks

Check the condition of all equipment for damaged, stressed or heated components
Check all visible wiring, conduits, connectors and manual interfaces for damage
Check all equipment for proper ventilation
Ensure all switches are set to normal position, mains power is on and connected to system
For microprocessor based systems save set-up and operational parameters on back-up disk
Amend access program to reflect changes due to public holidays
include any operational changes requested by the site

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=129


! في أمان الله


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top