الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Elevators
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Elevators
صيانة دورية جداول جاهزة نظام مصاعد
جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات
EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED
MICROSOFT WORD DOCUMENTS
Capacity
Qty: Lot
Make & Model
Location
Elevators
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks to be performed
Check condition of packing and bearing seals
Clean carbon brushes and brush holders of motor
Lubricate pin parts of machine
Check pulley alignment of safety governor switch box
Clean and lubricate selector gear sprocket
Check defacement of Drive Sheave
Check main rope slipping
Other recommended tasks
Check commentator of machine
Clean , lubricate and adjust brakes
Check break lining for wear
Check loose or dirty electrical connections on machine
Check governor and condition of all moving parts
Check , Lubricate machine bearings
Lubricate main ropes
Check condition of isolation pads under machine
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=111
! في أمان الله
Attachments
-
177.5 KB Views: 974