EQUIPMENT DETAILS Fire Alarm, Halon, Deluge Systems & Fm 200

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


EQUIPMENT DETAILS Fire Alarm, Halon, Deluge Systems & Fm 200

SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan

SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D106&hash=6114cd8444dc515bda7bc37ae74baeda


EQUIPMENT DETAILS Fire Alarm, Halon, Deluge Systems & Fm 200

صيانة دورية جداول جاهزة نظام نذار الحريق

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS

Capacity
Qty: Lot
Make & Model

Location
Fire Alarm, Halon, Deluge Systems & Fm 200


Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed
Clean control panel, batteries & charger
Check the battery voltage
Check the charger input and output voltage
Check the mains failure by disconnecting main power
Check the battery failure by disconnecting the battery
Put the system on and check the lamps
Activate (test) the detector and bill
Check gas cylinder pressure
Check the electrolyte level and gravity
Check the charging current
Calibrate the charger, if necessary
Check the detections circuit
Check the alarm circuits
Put off the system and clean all detectors
Other recommended tasks
Clean all the bills and sounders
Check the detection fault removing the detector
Check the alarm circuit fault by removing the bell and sounder
Replace all the defective parts

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=105


! في أمان الله


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top