SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Fire Alarm System PREVENTIVE MAINTENANCE

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



Fire Alarm System PREVENTIVE MAINTENANCE


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=202


EQUIPMENT DETAILS Fire Alarm System PREVENTIVE MAINTENANCE

صيانة دورية جداول جاهزة نظام إنذار الحريق

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

Fire Alarm System PREVENTIVE MAINTENANCE

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

1- Check for any hazards which may impair the performance of the alarm system
2- Check the system log book and records are correct and up to date
3- Check the system for any visible damage, loose equipment
4- Check that all break glass units are operational
5- Check the systems wiring for any electrical faults or deterioration

Other recommended tasks

6- Check the control panel for correct operation and any repeater or sub panels
7- Check the operation of any alarm signals or relays connected to dial up systems
8- Check the correct operation of any central station monitoring links
9- Check that all bells or sirens are operational
10- Check the correct operation of any automatic detection devices on the system
11- Check the fault monitoring of all circuits associated with the system
12- Check the standby batteries are in good condition and fully charged
13- Check the operation of the alarm system on standby batteries
14- Check the Certificate of Testing and Inspection

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=203

or you can download from attachments