الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Foam system / Monitor
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Foam system / Monitor
صيانة دورية جداول جاهزة نظام الفوم مكافحة الحريق
Capacity
Qty: Lot
Make & Model
Location
Foam system / Monitor
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks
Clean control panel, batteries , charges
Check the charger input and output voltage
Check the deflection circuit
Other recommended tasks
Check the alarm circuit.
Check and calibrate the sensitivity of the detectors and clean all detectors
Clean all bells and sounder
Check foam cylinder if needed arrange for filling
Fire alarm function test
Check nozzle and clean
Check pump operation
Check foam monitor
Replace all the defective
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=48
في أمان الله !
Attachments
-
112.5 KB Views: 796