الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Fresh Air Fan Units
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Fresh Air Fan Units
Capacity
صيانة دورية جداول جاهزة وحدة الهواء الجديد
Qty: Lot
Make & Model
Location
Fresh Air Fan Units
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Check the operation and change the sequence
Check the abnormal noises
Clean air filter if any
Check belt tension
Check the dumber
Grease /oil the bearing
Check the screen
Clean blade and fan
Check power and earth continuity
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=31
في أمان الله !
Attachments
-
115 KB Views: 662