الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Halon System 1301
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Halon System 1301
صيانة دورية جداول جاهزة نظام غاز الهالون مكافحة الحريق
Capacity
Qty: Lot
Make & Model
Location
Halon System 1301
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Check cylinder pressure, if needed arrange for filling
Fire alarm function test
Check nozzles , clean , if necessary
Replace all the defective parts.
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=52
في أمان الله !
Attachments
-
93 KB Views: 664