What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Heating and Ventilation Units

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS Heating and Ventilation Units


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D43&hash=0b27862bcb49b15ea07b3c387834a8fe


EQUIPMENT DETAILS Heating and Ventilation Units

صيانة دورية جداول جاهزة المبادلات الحرارية

Capacity
Qty: Lot
Make & Model

Location

Heating and Ventilation Units

Consumable Spare Parts

Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Inspect entire unit for unusual noise and/or vibration, ensure that it is in good working order.
Provide lubrication, if necessary
Check that damper linkages are properly connected and operating
Inspect piping and fittings for leaks (steam, condensate, hot water, chilled water).
Inspect ductwork flexible connectors for abnormalities or leaks.
Inspect felt/rubber gaskets around access doors.
Following inspection, record observations and deficiencies, if any.
Check outside air intake louvers.
If problems are identified and unit requires servicing, perform all Non-Critical Tasks for the problematic components.

Inspect pre and final filters for abnormal accumulation of dirt and debris, replace if necessary.
Write installation date on new filters.

Clean filter rack and vacuum filter section after removal of old filters and prior to installing new filters.

Inspect filter rack and ensure that air path does not bypass filters.
Inspect coils (steam, hot water, chilled water) for accumulation of dirt and debris, clean if necessary.

Inspect/adjust humidifier, if present
Check access doors for tightness.
Check fire smoke dampers for proper operation.
Inspect belts for proper tension and wear
(if belts are replaced, record belt type and replacement date on unit)

Inspect entire motor and fan assembly, clean with a damp cloth.
Lubricate fan bearings and motors.
Lubricate all moving parts/connections, if necessary.
Operate dampers over the full modulation range, verify proper operation.
Inspect all gauges and meters, ensure they are functional, replace if necessary.
Inspect coil fittings, tighten if necessary.
Utilize fin comb to straighten coil fins.
Clean/flush water or y-strainers and drip leg.
Inspect steam traps
Inspect all fan wiring for deterioration.
Tighten all electrical contacts.
Inspect motor starter/control center.
Verify operation of starter and inspect contact surfaces for pitting or wear.
Check damper linkage, set screws and blade adjustment for proper tightness.
Inspect bearing collar set screws on fan shaft, ensure tightness.
Inspect fan and motor sheaves for proper alignment.

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=42


في أمان الله !



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Last edited:

Top