الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Individual Drinking Water Cooler Units
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Individual Drinking Water Cooler Units
صيانة دورية جداول جاهزة براد ماء الشرب
Capacity
Qty: Lot
Make & Model
Location
Individual Drinking Water Cooler Units
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks
Check operation and control
Check and clean filter media
Change water filter, media , if necessary
Other recommended tasks
Check gas level
Check comp. motor terminals
Check for any leak if necessary replace valves and fittings
Check power and earth continuity
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=38
في أمان الله !
Attachments
-
103.5 KB Views: 826
Last edited: