الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Jockey Pump Fire
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Jockey Pump Fire
صيانة دورية جداول جاهزة مضخات الحريق المساعدة جوكي مضخة
Capacity
Qty: Lot
Make & Model
Location
Jockey Pump Fire
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Check for any leakage and repair
Check pump operation, control, pressure
switches on test line.
Grease and oil the bearing
Check power is healthy on panel and clean
Check bearing and mechanical seal
Clean and paint
Make general cleaning, check impeller , clean housing.
Check seals and change if necessary
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=46
في أمان الله !
Attachments
-
99.5 KB Views: 740
Last edited: