الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS S/S Kitchen Sink With fittings
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS S/S Kitchen Sink With fittings
صيانة دورية جداول جاهزة نظام المطابخ و مكوناتها
Capacity
Qty: Lot
Make & Model
Location
S/S Kitchen Sink With fittings
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks, to be performed
Check and clean
Check for any leak, if necessary replace angle
valves, flexible connection.
Clean filter cartridge
Clean traps
Replace filter cartridge if necessary
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=66
في أمان الله !
Attachments
-
118 KB Views: 868