SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS SMOKE EXHAUST AIR FANS ESF Monthly PREVENTIVE MAINTENANCE

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



SMOKE EXHAUST AIR FANS ESF Monthly PREVENTIVE MAINTENANCE


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=183


EQUIPMENT DETAILS SMOKE EXHAUST AIR FANS ESF Monthly PREVENTIVE MAINTENANCE

صيانة دورية جداول جاهزة مراوح التهوية و طرد الهواء

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

SMOKE EXHAUST AIR FANS ESF Monthly PREVENTIVE MAINTENANCE

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

1- Check correct operation and test run the fan units.
2- Motorized control dampers-check operation.
3- Fan and motor lubricate if necessary.
4- Check fan impeller/blower for any abnormal sound.
5- Check the motor for any deterioration.

Other recommended tasks

6- Motor casing and louvers-Check condition and clean.
7- Inspect Electrical connections for over heating or over loading tighten if necessary
8- Motor running current-note down motor running current at full load.
9- Check and clean starter panels.
10- Inspect the duct works for any damage.
11- Check Building Automation System controls.

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=184

or you can download from attachments
No registration required