What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Sterilizers and Autoclaves preventive maintenance

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS Sterilizers and Autoclaves preventive maintenance


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=160


EQUIPMENT DETAILS Sterilizers and Autoclaves preventive maintenance

صيانة دورية جداول جاهزة آلة التعقيم

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

Sterilizers and Autoclaves preventive maintenance

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

Sterilizers and Autoclaves

Daily Routine work:

1-Clean inside and outside with wet cloth and dry it off
2-Remove inside waste materials and water
3-Check audio visual
4-Check leaks and holes blockage
5-Check connectors and adapters for tightness

Weekly Routine work:

1-Clean the pressure regulating valve, safety valve
2-Check all moving parts and seals

Monthly Routine work:

1-Check plug, cable or socket .

Other recommended tasks

Quarterly

1- Check pressure gauges
2-Check temperature gauges

Semi annual

1-Check autoclave under pressure with water
2- Retest autoclave under pressure with water only

Annually Routine Work:

1- Check plug, cable or socket
2-Check the heating element connection
3-Check leaking gaskes and seals
4-Check and clean heating element if covered with limescale

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=159

or you can download from attachments
No registration required

! في أمان الله



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top