EQUIPMENT DETAILS Variable Air Volume Terminal Units boxes
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Variable Air Volume Terminal Units boxes
Capacity
صيانة دورية جداول جاهزة وحدة التحكم بحجم الهواء المتغيرة
Qty: Lot
Make & Model
Location
Variable Air Volume Terminal Units boxes
Consumable Spare Parts
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Check the temperature on the thermostat to
room
Check damper operation
Check electrical and control connection
Check operation of electric heaters if any
Check air flow quantity
Calibrate and check air flow
Function of other control equipments
Observe unit, note any unusual noise and/or vibrations.
Ensure that unit is supplying air if in demand, vice versa.
Provide lubrication, if necessary.
Other recommended tasks
Inspect all pneumatic/electrical connections, tighten if necessary.
Observe and inspect VAV control box.
Inspect all fan wiring for deterioration.
Inspect motor-shaft connection and ensure tightness.
Clean dampers and fan blades.
Inspect controls and cycle actuators to ensure proper operation.
Verify that dampers open and close fully.
Inspect all linkages and ensure proper positioning.
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer