الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين
EQUIPMENT DETAILS Water Boilers
SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan
EQUIPMENT DETAILS Water Boilers
صيانة دورية جداول جاهزة نظام سخانات الماء المركزية سخان ماء مركزي
Capacity
Qty: Lot
Make & Model
Location
Smoke Fan
Water Boilers
Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes
Item Description
Qty Notes
Critical Tasks
Clean and check all valve for free travel
Check hot water temperature in/out
Check all temperature controls
Examine distribution pipe work and valves for leaks
Examine pipe work and connections for drainage and leaks
Test thermometer and gauge
Clean and test valves on clarifiers
Test thermostatic controls
Other recommended tasks
Clean hot water pump from inside
Clean valve from inside
Check for safety valves
Clean Boiler tank internally
Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer
http://www.sitei.net/up/do.php?id=62
في أمان الله !
Attachments
-
153.5 KB Views: 719