What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Water Treatment Units preventive maintenance

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS Water Treatment Units preventive maintenance


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan



do.php?img=155


EQUIPMENT DETAILS Water Treatment Units preventive maintenance


صيانة دورية جداول جاهزة نظام بوابات الدخول المؤمنة


جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات


EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED


MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES


Capacity

Qty: Lot

Make & Model


Location


Water Treatment Units preventive maintenance


Task Description

D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually

A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down

2W M 3M

6M A Notes


Item Description

Qty Notes


Critical Tasks to be performed


Water Treatment Units


Daily Routine work:

1. Check and record: Reading in the instruments.

2. Check chemical levels in drum.


Weekly Routine work:


1. Strainer cleaning.

2. Re-adjust metering pumps and bleeding system

according to the requirements of laboratory.


Monthly Routine work:


1. Dosing pumps “Metering Pumps”: Cleaning the heads, suction and injection parts.

2. Conductivity cell cleaning.

3. Re-calibrate the Measuring Instruments by using

the testing Kit for measuring the treated water.


Other recommended tasks


Annually Routine Work:


1. Clean and paint.

2. Dis-assemble pumps and repair or replace if necessary.

3. Calibrate and repair the measuring instruments.


Notes

Use additional sheets if required

PPM routines based on Complete

Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d




or you can download from attachments

No registration required


! في أمان الله



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top