What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

HOSPITALITY Dishwasher Hard wired

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



Dishwasher Machine preventive maintenance


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=170


EQUIPMENT DETAILS Dishwasher Machine preventive maintenance

صيانة دورية جداول جاهزة غسالة الأطباق

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

Dishwasher Machine preventive maintenance

This includes but not limited to :
cryoprobes, - instance audiometers - blood gas analyzers,
cardiac monitors - stimulators - infusion pumps

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

Dishwasher Machine

Daily Routine work:

1- Check that doors open easily
2- Check that pump intake screen is in place
3-check that dishwasher starts when door is closed


Weekly Routine work:

1- Check for lime buildup inside
2- Check that drain opens and closes easily

Monthly Routine work:

1- Check that auto fill works and shuts off
2- Check for leaks Check that scrap tray is in place and clean

Other recommended tasks

Quarterly

1- Check that incoming high temperature of water is at least 180 F
2- Check that incoming water temperature 120 degrees F for chemical

Semi annual

1- Check the wash , rinse arms and nozzles

Annually Routine Work:

1- Descale unit using a product recommended by the manufacturer

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=169

or you can download from attachments
No registration required

! في أمان الله



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

More Thread Same Category

Top