What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS anaesthesia anaesthetic machine preventive maintenance

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2


الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS anaesthesia anaesthetic machine preventive maintenance


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


SCHEDULES OF PLANNED PREVENTATIVE MAINTENANCE Work Plan


do.php?img=157


EQUIPMENT DETAILS anaesthesia anaesthetic machine preventive maintenance

صيانة دورية جداول جاهزة آلة التخدير

جاهزة للتحميل و سهلة التعديل و الطباعة مايكروسوفت وورد ملفات

EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED

MICROSOFT WORD DOCUMENTS TECHNICAL DATA SCHEDULES

Capacity
Qty: Lot
Make & Model

Location

anaesthesia anaesthetic machine preventive maintenance

Task Description
D / Daily W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes

Critical Tasks to be performed

anaesthesia anaesthetic machine

Daily Routine work:
1-Clean by a dry cloth remove dirt and dust
2-Remove inside waste materials and water
3-Check audio visual
4-Check leaks and holes blockage
5-Check connectors and adapters for tightness

Weekly Routine work:

1-Clean inside and outside with wet cloth and dry it off
2-Check all moving parts and seals
3-Check depressurize system and all caps and covers
4-Replace soda lime if it has turned blue
5-Replace any deteriorated hoses and tubing.

Monthly Routine work:

1. check pressure gauges rise.

Other recommended tasks

quarterly

1. check leaks

semi annual

1-Check with soapy solution
2- Check all moving parts move freely

Annually Routine Work:

1- Check plug, cable or socket

Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


https://www.sitei.net/up/do.php?id=158

or you can download from attachments
No registration required

! في أمان الله



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top