EQUIPMENT DETAILS Variable Air Volume Terminal Units boxes

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


EQUIPMENT DETAILS Variable Air Volume Terminal Units boxes

SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D30&hash=99931280cead89459b059bb4a907175c


EQUIPMENT DETAILS Variable Air Volume Terminal Units boxes

Capacity
صيانة دورية جداول جاهزة وحدة التحكم بحجم الهواء المتغيرة
Qty: Lot
Make & Model

Location

Variable Air Volume Terminal Units boxes

Consumable Spare Parts

Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes


Check the temperature on the thermostat to
room
Check damper operation
Check electrical and control connection
Check operation of electric heaters if any
Check air flow quantity
Calibrate and check air flow
Function of other control equipments
Observe unit, note any unusual noise and/or vibrations.
Ensure that unit is supplying air if in demand, vice versa.
Provide lubrication, if necessary.
Other recommended tasks
Inspect all pneumatic/electrical connections, tighten if necessary.
Observe and inspect VAV control box.
Inspect all fan wiring for deterioration.
Inspect motor-shaft connection and ensure tightness.
Clean dampers and fan blades.
Inspect controls and cycle actuators to ensure proper operation.
Verify that dampers open and close fully.
Inspect all linkages and ensure proper positioning.


Notes
Use additional sheets if required
PPM routines based on Complete
Running hour where recommended by the Manufacturer


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d


http://www.sitei.net/up/do.php?id=29


في أمان الله !


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top