What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS: Centrifugal Water Cooled Chiller

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



EQUIPMENT DETAILS: Centrifugal Water Cooled Chiller


SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D21&hash=c31044357c3936c53e90a251a4a99c87


ready to use and / or to be printed doc file


Task Description صيانة دورية جداول جاهزة شيلر

daily - weekly - monthly - quarterly - semi annual - annual

W – Weekly M - Monthly Q - Quarterly SA- Semi-Annually
A- Annually SST - Seasonal Start-Up SSH - Season Shut Down

routine maintenance

Check the operation and abnormal noise / sound. D

Take log sheet every 2 hours. D

Check power supply for fluctuation. D

Check Oil Level. D

Check Oil temperature. D

Check gas level. D

Check flow switch functioning. D

Check Control & electrical connection. M

Check all safety control. 6M

Check vane operation. M

Lubricate vane linkage and other Moving parts. 6M

Calibrate all gauges. 6M
Check Motor Compressor terminals. 6M
Clean condenser and evaporator coils and replace gaskets. A

Clean and epoxy count marine box. A

Change oil and filter after maintenance. A

Change refrigerant filter. A

Test for leaks. A

Fill condenser and chilled water system.

Ensure that unit's internal heater is operating properly before start-up.

Inspect for proper operation of oil cooler.

Ensure that both chilled and condenser water make-up systems are operating properly.


Ensure proper operation of vanes and associated linkages.

Check motor assembly for proper alignment and lubrication.

Check operation of the lubrication system.

Inspect for refrigerant/oil leaks. Repair leaks if found.

Check refrigerant levels and recharge if needed

Note unit run time, number of starts.

Check all relays and operating/safety controls.

Ensure that controls are providing proper/efficient operation of chiller. Check chilled water

reset.

While chiller is operating, document all pressures and temperatures.

Observe all valves and piping, inspect for leaks, repair if necessary.

Inspect that all actuators, linkages, moving parts associated with chiller system control are

properly adjusted, tighten if necessary.

Observe chiller components (i.e. - pumps, controls, motors, etc.) for proper operation.

After first day of operation, flush and drain system to remove dirt and debris.

Observe unit while in operation, note any unusual noise or vibration.

Inspect for refrigerant/oil leaks. Repair leaks if found.

Observe all valves and piping, inspect for leaks, repair if necessary.

While chiller is operating, document all pressures and temperatures.

Check refrigerant levels and recharge if needed

Flush/clean chilled and condenser water piping strainers.

Inspect lubrication system for proper operation.



download

proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d



http://www.sitei.net/up/do.php?id=20


في أمان الله !



proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Last edited:

Top