What's new
SCHEDULES OF PLANNED PREVENTIVE MAINTENANCE CHECKLISTS

Planned Preventive Maintenance checklists , EASY AND READY TO BE DOWNLOADED , MODIFIED AND PRINTED MICROSOFT WORD DOCUMENTS W Weekly M Monthly Q Quarterly SA Semi/Annually A Annually SST Seasonal Start Up SSH Season Shut Down . No Registeration Needed!

EQUIPMENT DETAILS Reciprocating Air Cooled Chillers

Mannan

Administrator
Staff member
#1


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D3&hash=ae866cb1b633706ea853d3841bcbc208


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D4&hash=b63a662fc34192936ec29f3cd1a1fec2



الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين


EQUIPMENT DETAILS Reciprocating Air Cooled Chillers

SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D11&hash=5f161437331f53175b2651c57c007ec8


Air- cooled Packaged Water Chiller

Capacity
صيانة دورية جداول جاهزة وحدة تبريد مياه مركزية بالهواء
Qty: Lot
Make & Model

Location

Annual Requirements to Short Life

Consumable Spare Parts

Task Description
W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
2W M 3M
6M A Notes

Item Description
Qty Notes


Check operation and abnormal noise level

Tag log sheet every 2 hours.
Check power supply for fluctuation
Check oil level
Check Oil temperature
Check gas level
Check flow switch functioning
Check control and electric connection
Check all safety control
Caliberate all gauges
Clean evaporator coil
Clean condenser coil


Blow down control panel with blower
Check all electrical terminals
Check oil and filter after maintenance
Change oil and filter after maintenance.
Test for leaks

Notes :
1 Use additional sheets if required
2 PPM routines based on Complete
Running hour where recommended by the Manufacturer

Check unit for proper operation, excessive noise or vibration.
Run system diagnostics test.
Check oil level in sight glass of lead compressor only, add oil as necessary.
Check superheat and sub cooling temperatures.
Check liquid in line sight glass, oil and refrigerant pressures.
Check contactors, sensors and mechanical safety limits.
Check electrical wiring and connections; tighten loose connections.
Clean intake side of condenser coils, fans, and intake screens.
Inspect fan(s) or blower(s) for bent blades or imbalance.
Lubricate shaft bearings and motor bearings as required.
Inspect plumbing and valves for leaks, adjust as necessary.
Check evaporator and condenser for corrosion.
Clean chiller and surrounding area.
Fill out maintenance checklist and report deficiencies.


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D6&hash=e694c7d9a3c445d7e5187539c644951d



http://www.sitei.net/up/do.php?id=10


في أمان الله !


proxy.php?image=http%3A%2F%2Fwww.sitei.net%2Fup%2Fdo.php%3Fimg%3D5&hash=acaedc343055116a139b8f0cbf6d6ab6


 

Attachments

Top